求翻译!!!如下为物料确认方面的常用英语。
1 the current lack of three particles.
The 2 one card pass, is customs clearance, is expected in March 1st to the factory.
3 the other two material is expected in April 1st to the factory.
4 a IC due to quality problems, IQC found out.I contact the manufacturer of processing.
5 a IC RD has not conceded.There are two schemes, one is with the reminder of the RD as soon as possible to recognize, another option is to sign the concession single.
6 a IC I'm looking for alternative materials.